“Designing installations in 3D is routine for us now,” says Ulrica Keisu, of WSP Systems in Sweden. She is senior project managerforthe 3D design of heating, ventilation and sanitation systems for “Boden Arena” using MagiCAD. This is just one of many WSP projects where 3D offers major benefits through the coordination of design and installation work.
Cooperation and coordination
WSP Systems has worked in close cooperation with the contractor PEAB throughout the construction period. Heating, ventilation and sanitation, electricity, the architect’s model and design have been prepared in a common model which has been in frequent use at the construction site.
MagiCAD – a strategic choice
WSP Systems has used MagiCAD for many years. The company’slast contractfor MagiCAD isthe third long-term contractin succession and runs until 2011. The first wassigned back in 2003.
During 2008, WSP Systemsis carrying outits most ambitioustraining program. More than 450 employees at 14 officesin Sweden will boost their knowledge of CAD design using MagiCAD. The training will ensure thatthe employees all have a good basic level of knowledge, use the correct working methods and fully utilise the program’sfunctions – everything necessary to achieve increased efficiency and quality.